At the plant HGY2 we performed a fresh air system reconstruction to ensure a capacity increase of 25%. To enable the installation of the new system the existing kiln system was dismantled and modified.

  • We manufactured and installed 32 tones of steel structure and about 300 running metres of sheet metal canal. The dimensions of the canal are 1600x2000mm, with a cross section of 3.2m2.
  • 2 medium-duty flue gas–air heat exchanger, each weighing 12t were installed.
  • A flue gas fan of 1230kW, a total mass of 23t and a transport capacity of 132 000kg/h was installed, and our company performed its installation, setting and commissioning.